>
products
>
Case Studies

CASE STUDIES

POWDER COATING
40% More Productive by Lunch

The Day Baldor (ABB) Motors
Transformed Its Entire Line

POWDER COATING
The Million-Dollar Weekend

Prime Heat Saved Baldor (ABB)
Motors $1M a Day in 48 Hours

WOOD WORKING
He Replaced Racks with PowerCarts—and Became a Company Rock Star

How Palmer-Donovin’s Plant Leader
Scaled the Business

WOOD WORKING
Finishing Was the Bottleneck. Now It’s the Launchpad.

How One Tunnel Powered a
Complete Facility Expansion

FINE INSTRUMENTS
From Workshop to Concert Hall: Prime Heat Moves the World’s Finest Pianos

Preserving Steinway’s 18th Century
Finishing Process.

FURNITURE MAKING
Their Finishing Line Outran the Entire Department. By Noon.

When the Finishing Line Becomes
the Fastest Line in the Factory

WOOD WORKING
From 24-Hour Dry Time to 1-Hour Flow Time

The Day a Warehouse Went From
Paralyzed to Sprinting

AEROSPACE
Aerospace Has No Room for Mistakes. That’s Why Gulfstream Chose Prime Heat.

The Retrofit That Delivered Zero
Downtime—and Total Flexibility

WOOD WORKING
From Panic to Profit.
And a Client for Life.

The Friday Deadline That Made a
Lifelong Customer