>
products
>
Case Studies
CASE STUDIES
POWDER COATING
40% More Productive by Lunch
The Day Baldor (ABB) Motors
Transformed Its Entire Line
POWDER COATING
The Million-Dollar Weekend
Prime Heat Saved Baldor (ABB)
Motors $1M a Day in 48 Hours
WOOD WORKING
He Replaced Racks with
PowerCarts—and Became a
Company Rock Star
How Palmer-Donovin’s Plant Leader
Scaled the Business
WOOD WORKING
Finishing Was the Bottleneck. Now It’s the Launchpad.
How One Tunnel Powered a
Complete Facility Expansion
FINE INSTRUMENTS
From Workshop to Concert Hall:
Prime Heat Moves the World’s
Finest Pianos
Preserving Steinway’s 18th Century
Finishing Process.
FURNITURE MAKING
Their Finishing Line Outran the
Entire Department. By Noon.
When the Finishing Line Becomes
the Fastest Line in the Factory
WOOD WORKING
From 24-Hour Dry Time to
1-Hour Flow Time
The Day a Warehouse Went From
Paralyzed to Sprinting
AEROSPACE
Aerospace Has No Room for
Mistakes. That’s Why
Gulfstream Chose Prime Heat.
The Retrofit That Delivered Zero
Downtime—and Total Flexibility
WOOD WORKING
From Panic to Profit.
And a Client for Life.
And a Client for Life.
The Friday Deadline That Made a
Lifelong Customer
